Planejamento, gestão e controle na construção civil : atrasos na conclusão de obras em instituições públicas de ensino superior.
dc.contributor.advisor | Guimarães, Irce Fernandes Gomes | pt_BR |
dc.contributor.advisor | Vale, Clécio Magalhães do | pt_BR |
dc.contributor.author | D’Angelo, Aldo César Andrade | |
dc.contributor.referee | Guimarães, Irce Fernandes Gomes | pt_BR |
dc.contributor.referee | Vale, Clécio Magalhães do | pt_BR |
dc.contributor.referee | Souza, Clarisse da Silva Vieira Camelo de | pt_BR |
dc.contributor.referee | Aguiar, Tito Flávio Rodrigues de | pt_BR |
dc.contributor.referee | Silvado, Rodolfo Gonçalves Oliveira da | pt_BR |
dc.date.accessioned | 2022-07-14T19:48:16Z | |
dc.date.available | 2022-07-14T19:48:16Z | |
dc.date.issued | 2022 | pt_BR |
dc.description | Programa de Pós-Graduação em Engenharia das Construções. Departamento de Engenharia Civil, Escola de Minas, Universidade Federal de Ouro Preto. | pt_BR |
dc.description.abstract | A Administração Pública (AP) geralmente executa obras e reformas contratando empresas especializadas no ramo da construção civil, através de licitações. Em muitos casos, esses contratos sofrem atrasos na execução, sendo que as causas são derivadas de diversos fatores. Neste sentido, este estudo teve como objetivo, investigar os motivos desses atrasos em obras contratadas por Instituições de Ensino Público. Para a investigação dos principais fatores causadores dos aditamentos, foi realizada uma revisão da literatura sobre planejamento e controle em obras públicas. Além disso, foi realizado um Estudo Bibliométrico avaliando como a produção científica tem tratado esse tema. Para uma análise comparativa entre os resultados encontrados na Revisão Bibliográfica e no Estudo Bibliométrico, foi desenvolvido um estudo de caso em uma Instituição de Ensino Superior, partindo de um mapeamento de dados dos contratos das obras realizadas nos últimos 10 anos. Percebeu-se que, das 35 obras analisadas, 83% tiveram acréscimo de prazo. As principais causas detectadas foram, acréscimos de serviços devido à erros de planilha e de projetos e acréscimos de serviços devido à alterações dos projetos. | pt_BR |
dc.description.abstracten | The Public Administration (PA) usually executes works and renovations by contracting companies specialized in civil construction, through public tenders. In many cases, these contracts suffer delays in the execution, and the causes derived from several factors. For that matter, this study aimed to investigate the reasons for these delays in works contracted by Public Education Institutions. To investigate the main factors causing the amendments, a review of the literature on planning and control in public works was executed. In addition, a bibliometric study was carried out evaluating how scientific production has dealt with this topic. For a comparative analysis between the results found in the bibliographic review and in the bibliometric study, a case study was developed in a Higher Education Institution, starting from a mapping of data from the contracts of the works carried out in the last 10 years. It was noticed that, from the 35 works analyzed, 83% had a deadline increase. The main causes detected were service additions due to spreadsheet and project errors and service additions due to project changes. | pt_BR |
dc.identifier.citation | D'ANGELO, Aldo César Andrade. Planejamento, gestão e controle na construção civil: atrasos na conclusão de obras em instituições públicas de ensino superior. 2022. 97 f. Dissertação (Mestrado Profissional em Engenharia das Construções) - Escola de Minas, Universidade Federal de Ouro Preto, Ouro Preto, 2022. | pt_BR |
dc.identifier.uri | http://www.repositorio.ufop.br/jspui/handle/123456789/15053 | |
dc.language.iso | pt_BR | pt_BR |
dc.rights | aberto | pt_BR |
dc.rights.license | Autorização concedida ao Repositório Institucional da UFOP pelo(a) autor(a) em 07/07/2022 com as seguintes condições: disponível sob Licença Creative Commons 4.0 que permite copiar, distribuir e transmitir o trabalho, desde que sejam citados o autor e o licenciante. Não permite o uso para fins comerciais nem a adaptação. | pt_BR |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | * |
dc.subject | Obras públicas - planejamento e controle | pt_BR |
dc.title | Planejamento, gestão e controle na construção civil : atrasos na conclusão de obras em instituições públicas de ensino superior. | pt_BR |
dc.type | Dissertacao | pt_BR |
Arquivos
Pacote original
1 - 1 de 1
Nenhuma Miniatura Disponível
- Nome:
- DISSERTAÇÃO_PlanejamentoGestãoControle.pdf
- Tamanho:
- 2.42 MB
- Formato:
- Adobe Portable Document Format
- Descrição:
Licença do pacote
1 - 1 de 1
Nenhuma Miniatura Disponível
- Nome:
- license.txt
- Tamanho:
- 1.71 KB
- Formato:
- Item-specific license agreed upon to submission
- Descrição: