Modelo de simulação para sistemas produtivos integrado entre mina, usina e expedição.

dc.contributor.advisorSilva, José Margarida dapt_BR
dc.contributor.advisorDestro, Eltonpt_BR
dc.contributor.authorRezende, Marcelo Vieira
dc.contributor.refereeSilva, José Margarida dapt_BR
dc.contributor.refereeCabral, Ivo Eyerpt_BR
dc.contributor.refereeRodrigues, Lásara Fabríciapt_BR
dc.date.accessioned2023-11-21T19:48:18Z
dc.date.available2023-11-21T19:48:18Z
dc.date.issued2023pt_BR
dc.descriptionPrograma de Pós-Graduação em Engenharia Mineral. Departamento de Engenharia de Minas, Escola de Minas, Universidade Federal de Ouro Preto.pt_BR
dc.description.abstractAs cadeias produtivas industriais, entre elas a mineração, exigem cada vez mais eficiência e integração. Neste sentido, este trabalho propõe o uso da simulação por eventos discretos como ferramenta útil ao planejamento de produção e tomada de decisão em uma mineração, considerando as interferências entre mina, usina de tratamento de minérios e expedição, com enfoque em um horizonte de curto prazo (trimestral). O estudo de caso usou como base um empreendimento com sistema de lavra rígido e integrado por correias, da mina à expedição, com poucas possibilidades de estoque de material ao longo do circuito produtivo para possíveis misturas e ajustes da qualidade do material. Foram simulados cenários os quais propõem soluções para aumento de produção por meio de mudanças nas configurações técnicas do sistema produtivo e não por meio da identificação de melhores frentes de lavra na mina, uma vez que a lavra rígida impõe dificuldades a este tipo de solução. Este trabalho também traz, como um dos fatores geradores de paradas de produção, o tipo de material que está sendo manuseado. Isto é relevante, pois cada tipo de material pode causar um impacto operacional e/ou mecânico, a depender das proporções destes materiais em dado momento do modelo simulado. Devem ser identificados e impactos devem ser mitigados, para os momentos em que ocorrerá a combinação da lavra de materiais com comportamento coesivo, aumentando as possibilidades de entupimentos em dispositivos de transferência. Também devem ser identificados os momentos que ocorrerão a combinação da lavra de materiais com maior resistência mecânica e, portanto, maior probabilidade de causar danos às correias e materiais de desgaste. Na prática atual, rotinas de planejamento de lavra e programação de produção de curto prazo, usualmente, consideram como premissas poucos dados determinísticos, sem levar em conta a dinâmica trazida pela combinação destes possíveis eventos em cada instante do processo produtivo. Quanto às simulações realizadas no software Flexsim, algumas premissas probabilísticas do sistema produtivo foram obtidas de forma empírica e, um refinamento destes dados, por meio de estudos estatísticos obtidos de sistemas de apontamentos e despacho, poderá ser considerado como proposta para trabalhos futuros.pt_BR
dc.description.abstractenSince industrial production chains demand more and more efficiency and integration, this work proposes the use of discrete event simulation as a useful tool for production planning and decision making in mining, considering the interferences between the mine, plant and dispatch, focusing on a short-term horizon (quarterly). The case study used as mine data an enterprise with a rigid mining system integrated by belts, from the mine to the train loading point, with few possibilities of material stock along the production circuit for possible blending to adjust the quality. Scenarios were simulated which propose solutions to increase production through changes in the technical configurations of the production system, not through the identification of better mining fronts in the mine, once rigid mining difficulties this type of solution. This work also brings as one of the factors that generate production stoppages the type of material being produced. It is relevant, as each type of material can cause an operational and/or mechanical impact, depending on the proportions of these materials at a given moment in the simulated model. They must be identified, and impacts must be mitigated, for the moments that the combination of materials with cohesive behavior will occur, increasing the possibilities of clogging in transfer structures. The moments that materials with greater mechanical resistance are mined, and therefore more likely to cause damage to the belts and wear materials, must also be identified. Usually, mine planning and short-term production scheduling routines usually only consider few deterministic data as assumptions, without considering the dynamics about the combination of these possible events at each instant of the production process. About the simulations carried out in the Flexsim software, some probabilistic assumptions of the production system were empirically obtained, and a refinement of these data, through statistical studies obtained from note and dispatch systems, may be considered as a proposal for future work.pt_BR
dc.identifier.citationREZENDE, Marcelo Vieira. Modelo de simulação para sistemas produtivos integrado entre mina, usina e expedição. 2023. 147 f. Dissertação (Mestrado em Engenharia Mineral) - Escola de Minas, Universidade Federal de Ouro Preto, Ouro Preto, 2023.pt_BR
dc.identifier.urihttp://www.repositorio.ufop.br/jspui/handle/123456789/17824
dc.language.isopt_BRpt_BR
dc.rightsabertopt_BR
dc.rights.licenseAutorização concedida ao Repositório Institucional da UFOP pelo(a) autor(a) em 06/11/2023 com as seguintes condições: disponível sob Licença Creative Commons 4.0 que permite copiar, distribuir e transmitir o trabalho, desde que sejam citados o autor e o licenciante. Não permite o uso para fins comerciais nem a adaptação.pt_BR
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/*
dc.subjectMinas e mineração - planejamento de lavrapt_BR
dc.subjectMineração a céu abertopt_BR
dc.titleModelo de simulação para sistemas produtivos integrado entre mina, usina e expedição.pt_BR
dc.typeDissertacaopt_BR

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Nenhuma Miniatura Disponível
Nome:
DISSERTAÇÃO_ModeloSimulaçãoSistema.pdf
Tamanho:
7.04 MB
Formato:
Adobe Portable Document Format
Descrição:

Licença do pacote

Agora exibindo 1 - 1 de 1
Nenhuma Miniatura Disponível
Nome:
license.txt
Tamanho:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descrição: