Direct block scheduling under marketing uncertainties.

dc.contributor.authorBurgarelli, Hudson Rodrigues
dc.contributor.authorSouza, Felipe Ribeiro
dc.contributor.authorNader, Alizeibek Saleimen
dc.contributor.authorTorres, Vidal Félix Navarro
dc.contributor.authorCâmara, Taís Renata
dc.contributor.authorArroyo Ortiz, Carlos Enrique
dc.contributor.authorGalery, Roberto
dc.date.accessioned2019-05-10T12:09:22Z
dc.date.available2019-05-10T12:09:22Z
dc.date.issued2018
dc.description.abstractMineral projects are composed of geological, operational and market uncertainties, and reducing these uncertainties is one of the objectives of engineering. Most surveys assess the impact of geological and operational uncertainties on the mining planning. The objective of this work is to study the impact of market uncertainty on the mineral activity. The influence of iron ore price simulation on mining sequencing will be evaluated. The price of iron ore has random behavior that is best represented by the Geometric Brownian Movement system. This study analyzed the historical series of iron ore in order to determine the percentage volatility and drift. Traditionally, a constant and deterministic price is used for the ore mined in all periods of a mineral project. The direct block scheduling methodology was adopted because it is able to apply the appropriate financial discount factor to the simulated probabilistic price. The proposed methodology was able to quantify the market uncertainty.pt_BR
dc.identifier.citationBURGARELLI, H. R. Direct block scheduling under marketing uncertainties. REM - International Engineering Journal, v. 71, p. 275-280, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_abstract&pid=S2448-167X2018000200275&lng=en&nrm=iso>. Acesso em: 12 fev. 2019.pt_BR
dc.identifier.doihttp://dx.doi.org/10.1590/0370-44672017710128pt_BR
dc.identifier.issn1807-0353
dc.identifier.urihttp://www.repositorio.ufop.br/handle/123456789/11263
dc.language.isoen_USpt_BR
dc.rightsabertopt_BR
dc.rights.licenseA REM - International Engineering Journal - autoriza o depósito de cópia de artigos dos professores e alunos da UFOP no Repositório Institucional da UFOP. Licença concedida mediante preenchimento de formulário online em: 12 set. 2013.pt_BR
dc.subjectMine planningpt_BR
dc.subjectMine schedulingpt_BR
dc.subjectPrice simulationpt_BR
dc.subjectBrownian motionpt_BR
dc.titleDirect block scheduling under marketing uncertainties.pt_BR
dc.typeArtigo publicado em periodicopt_BR

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Imagem de Miniatura
Nome:
ARTIGO_DirectBlockShedulig.pdf
Tamanho:
655.86 KB
Formato:
Adobe Portable Document Format

Licença do pacote

Agora exibindo 1 - 1 de 1
Nenhuma Miniatura Disponível
Nome:
license.txt
Tamanho:
924 B
Formato:
Item-specific license agreed upon to submission
Descrição: