Short-term planning of a work shift for open-pit mines : a case study.

dc.contributor.authorSilva Júnior, Ademar Lopes da
dc.contributor.authorMartins, Aldrin Gustavo
dc.contributor.authorPantuza Júnior, Guido
dc.contributor.authorCota, Luciano Perdigão
dc.contributor.authorSouza, Marcone Jamilson Freitas
dc.date.accessioned2023-07-26T19:53:47Z
dc.date.available2023-07-26T19:53:47Z
dc.date.issued2023pt_BR
dc.description.abstractThis work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal program- ming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.pt_BR
dc.identifier.citationSILVA JÚNIOR, A. L. da et al. Short-term planning of a work shift for open-pit mines: a case study. Cogent Engineering, v. 10, n. 1, artigo 2168172, 2023. Disponível em: <https://doi.org/10.1080/23311916.2023.2168172>. Acesso em: 06 jul. 2023.pt_BR
dc.identifier.doihttps://doi.org/10.1080/23311916.2023.2168172pt_BR
dc.identifier.issn2331-1916
dc.identifier.urihttp://www.repositorio.ufop.br/jspui/handle/123456789/17072
dc.language.isoen_USpt_BR
dc.rightsrestritopt_BR
dc.rights.licenseThis open access article is distributed under a Creative Commons Attribution (CC-BY) 4.0 license. Fonte: PDF do artigo.
dc.subjectBlendingpt_BR
dc.subjectTruck allocationpt_BR
dc.subjectMixed-integer linear programmingpt_BR
dc.subjectGoal programmingpt_BR
dc.titleShort-term planning of a work shift for open-pit mines : a case study.pt_BR
dc.typeArtigo publicado em periodicopt_BR

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Imagem de Miniatura
Nome:
ARTIGO_ShortTermPlanning.pdf
Tamanho:
5.29 MB
Formato:
Adobe Portable Document Format
Descrição:

Licença do pacote

Agora exibindo 1 - 1 de 1
Nenhuma Miniatura Disponível
Nome:
license.txt
Tamanho:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descrição: